The City of Columbus
Department of Public Service
Mobility & Parking Services
August 2024 - Present
August 2024 - Present
The Division of Mobility and Parking Services (MaPS) exists to provide safe and predictable mobility and parking options for residents and visitors to the City of Columbus (City of Columbus, 2023).
MaPS does this by increasing the number of options people have to travel within the City of Columbus. Through its management of the shared micro-mobility program, BikePlus program, vehicular parking and the planning of non-car exclusive transportation infrastructure, MaPS is working to diversify and modernize the way people move around Columbus, Ohio.
Published Guidelines (2026)
The 2026 Bike Parking Guidelines were created in order to assist developers and property managers with the implementation of development-side bike parking.
I completed initial research and draft recommendations in 2024. Following this, I developed illustrations for the "Design & Layout Guidance" section in 2025. Between 2025 and 2026 my team and I collaborated internally and with the city's Department of Development to produce the final published bike parking guidelines document.
Tools Used: Adobe Illustrator, Adobe InDesign
Illustrations & Layout Importance (2025)
Initial Research (2024)
Short-Term & Long-Term Parking Guidance Language (2025 - 2026)
Network Gap Analysis & Prioritization Scheme
(In-Progress)
The DRAFT bike parking planning methodology serves to help MaPS planners understand where public bike parking is needed most without relying solely on public requests.
Between 2024 and 2025 I completed a comprehensive public bike parking audit across our entire network to ensure DPS GIS data accurately reflected real world conditions. I used this data to conduct an initial analysis of where bike parking was most concentrated in the city. Once inventory was up to date and an initial review of bike parking density was complete, I began working with my team and street crew to site and install bike racks from public request. Because bicycle mode share is low, the city historically has been slow to install new public bike parking. To remedy this, I am in the process of developing a new network gap analysis & prioritization scheme that will allow MaPS to deploy bike racks in places that can support cycling but don't yet have adequate parking infrastructure.
Tools Used: ESRI Quick Capture, ESRI ArcGIS Pro, ESRI Arcade, Adobe Illustrator
Before Public Request Fulfillment
After Public Request Fulfillment
Network Gap & Priority Spatial Analysis (In-Progress)
Initial Network Gap Analysis (2025)
Bike Parking Inventory Audit Results (2024 - 2025)
To see bike parking layer:
Acknowledge the disclaimer and zoom the map in by scrolling on it.
Drafting (In-Progress)
The DRAFT Public Engagement Checklist for MaPS Planners is designed to assist novice and experienced planners alike with public engagement process design and execution.
In 2024 I completed initial research for the DRAFT Public Engagement Checklist. My team and I are still in the process of drafting the final document. This document combines Public Engagement theory from my City and Regional Planning courses at Ohio State, knowledge gained during my time as an safe streets advocate and professional insights from myself and my team.
Tools Used: Adobe InDesign
Downtown Columbus Multimodal Coordination &
Design Review (In-Progress)
The Downtown Multimodal Coordination & Design Review Team (DMCT) is a cross divisional unit that is tasked with ensuring the process of modernizing Downtown Columbus' transportation network is completed according to goals laid out in plans such as BikePlus, Vision Zero and LinkUS.
I help the DMCT by conducting analysis of the various corridors we focus on. I also assist with some design review work when my schedule allows. My primary contribution to Downtown Multimodal Planning is via Bus Lane Enforcement research, compliance audit, and strategy development. The Central Ohio Transit Authority aims to add at least 3 bus rapid transit lines that operate in bus-only lanes within City of Columbus owned Right-Of-Way. Currently the City of Columbus maintains 2.8 lane-kilometers of peak-restricted parking bus-only lanes. In 2026 I conducted an analysis to understand the level of driver compliance within the 2.8km stretch. This analysis has triggered further conversations about how to manage the bus-only lanes that exist today and how the City will keep the new lanes outside of the core clear of private vehicles in the future.
Tools Used: ESRI ArcGIS, Google My Maps, Adobe Illustrator, Streetmix, Microsoft Excel
South Fourth Street Bike Lane Terminus Configuration (2026)
Bus Lane Enforcement Strategies Peer Research (2025 - 2026)
High Street Bus Lane Performance Audit (2026)
Summit Street at 14th Av Sketch
Summit Street at Oakland Av Sketch
Public Engagement for
Bike Facility Improvements
(2024 - Present)
Shared Mobility
Compliance Audit
(2024 - Present)
Broad Street
Protected Bike Lane
Material Performance Audit (2025)
Vision Zero
Corridor Evaluation
& Walk Audits (2025)
Level of Traffic Stress Review for
Mid-Ohio Regional Planning Commission
2026 Regional Bike Map Update (2025)
Staff Engagement Bike Rides
Planning & Support (2025 - Present)
Photos for Awarded Safe Routes to School Grant Application (2026)
Zoning Code Modernization Community Meetings (2025)
Shared Mobility Corral Siting
(2025 - Present)
Cleveland Av Safety Improvements Planning & Roadway Survey (2026)
Bike Facility Condition Audit (In-Progress)
National Association of City Transportation Officials (NACTO) Meet the Cities Presentation (2026)
Bike to Work Day